Most projects touch two or three at once, because a room rarely has just one problem.
Built to the length of your wall and the height of the people sitting on it. Sectionals, corner units, majlis runs and single armchairs.
The fastest way to change how a room feels. Curtains control light, heat, sound and how tall the room reads, all at once.
Where we started. If the frame is sound, recovering a piece costs a fraction of replacing it and keeps something you already know is comfortable.
The pieces around the seating. Dining tables, consoles, media walls, headboards, wardrobes and bar units.
A sofa or armchair runs four to six weeks from approved drawings. Curtains and blinds are faster, usually two to three. The clock starts when you sign off the drawings and fabric, not when you first call.
Far more depends on fabric than on frame. The same sofa can double in price between a hard-wearing weave and a full-grain hide, so our quotations itemise everything separately and you can move the budget to where you care about it.
Yes. We measure, bring samples and give you a direction, with no charge and no obligation to order afterwards.
Yes. Send us the reference and we will tell you the metreage needed. One caution: fabric you supply is not covered by our warranty on wear, because we cannot vouch for how it was rated.
Two years on frames and manufacturing workmanship, one year on upholstery workmanship. Fabric wear follows the mill's own rating, given to you in writing before you choose.
Book a free visit and we will bring the samples to you.